Last Updated on 4 years by Mumbai Metro City
Mumbai Line 3 (Colaba–Bandra-SEEPZ line) is 33.5-km long line will be the first underground metro line in Mumbai. The metro line will connect Cuffe Parade from south Mumbai to to SEEPZ in the north-central Mumbai. It will have 26 underground and one at-grade station.
List of stations – Mumbai Metro Line 3 Colaba–Bandra-SEEPZ | ||||
---|---|---|---|---|
# | Station Name | Connections | ||
1 | Cuffe Parade | None | ||
2 | Vidhan Bhavan | None | ||
3 | Churchgate Metro | Western Line (Churchgate) | ||
4 | Hutatma Chowk | None | ||
5 | CSMT Metro | Central Line (CSTM Station – Local) Harbour line (CSTM Station – Local) Indian Railways (CSTM Station – Mail) |
||
6 | Kalbadevi | None | ||
7 | Girgaon | None | ||
8 | Grant Road | Western Line (Grant Road) | ||
9 | Mumbai Central Metro | Western Line (Mumbai Central – Local) Indian Railways (Mumbai Central – Mail) |
||
10 | Mahalaxmi | Western Line (Mahalaxmi) Monorail |
||
11 | Nehru Science Museum | None | ||
12 | Acharya Atrey Chowk | None | ||
13 | Worli | None | ||
14 | Siddhivinayak | None | ||
15 | Dadar | Western Line (Dadar) Central Line (Dadar) Indian Railways (Dadar Terminus) |
||
16 | Shitaladevi | None | ||
17 | Dharavi | None | ||
18 | BKC | Line 2 (Under Construction) | ||
19 | Vidyanagri | None | ||
20 | Santacruz | None | ||
21 | Domestic Airport | Line 7 (Under Construction) | ||
22 | Sahar Road | Line 7 (Under Construction) | ||
23 | International Airport | Line 7 (Under Construction) | ||
24 | Marol Naka | Line 1 (Operational) | ||
25 | MIDC | None | ||
26 | SEEPZ | Line 6 | ||
27 | Aarey Depot | None |