Mumbai Metro Line 7 Andheri (East) – Dahisar (East)

Mumbai Metro Projects

Last Updated on 4 years by Mumbai Metro City

Mumbai Metro Line 7 Andheri (East) – Dahisar (East) :

Metro open for public: May 2021

Project cost: Rs. 6208 Cr. (including state taxes and 7.5% p.a escalation)
Length: 16.475 km (Elevated)
Work started: 15th October 2015

Mumbai Metro Line 7 – Andheri East – Dahisar East  (Red Line)
# Station Name Connections Status Alignment
English Marathi
1 Andheri (East) अंधेरी (पूर्व) Line 1 Under Construction Elevated
2 Shankarwadi शंकरवाडी None Under Construction Elevated
3 JVLR Junction जेवीएलआर जंक्शन Line 6 Under Construction Elevated
4 Mahanand Bombay Exhibition महानंद बॉम्बे प्रदर्शन None Under Construction Elevated
5 Hub Mall (Goregaon East) हब मॉल (गोरेगाव पूर्व) None Under Construction Elevated
6 Aarey Road Junction आरे रोड जंक्शन None Under Construction Elevated
7 Vitt Bhatti Junction (Dindoshi) विट्ट भट्टी जंक्शन (दिंडोशी) None Under Construction Elevated
8 Kurar Village कुरार गाव None Under Construction Elevated
9 Bandongri बाणडोंगरी None Under Construction Elevated
10 Mahindra & Mahindra महिंद्रा आणि महिंद्रा None Under Construction Elevated
11 Thakur Complex ठाकूर कॉम्प्लेक्स None Under Construction Elevated
12 Magathane Bus Depot (Borivali) मागाठाणे बस आगार (बोरिवली) None Under Construction Elevated
13 Borivali Omkareshwar (National Park) बोरीवली ओंकारेश्वर (नेशनल पार्क) None Under Construction Elevated
14 Shrinath Nagar (Ovaripada) श्रीनाथ नगर (ओवरीपाडा) None Under Construction Elevated
15 Dahisar (East) दहिसर (पूर्व) Line 2 and Line 9 Under Construction Elevated

 