Improved railway infrastructure at Mira Road station soon

Mira Road News

Last Updated on 7 years by Mumbai Metro City

In the Railway budget, Railway Minister Suresh Prabhu has approved all the seven projects worth Rs 8,775 crore under Mumbai Urban Transport Project-III (MUTP-III) to improve the Mumbai’s railway infrastructure. However, by the time these reach completion the cost will have run up to Rs 11,441 crore.

Further under MUTP-III, 20 suburban stations will be developed at a total cost of Rs 1,950 crore which will have an integrated transportation system wherein there will be a separate area for autorickshaws and taxi parking. Also, these stations will have a better ticketing facility along with escalators, elevators and Foot Over Bridges (FOB). The phase-III will also take care of the trespassing at mid-section with construction of an FOB in between two stations.

The 20 stations are –

  • Virar, Bhayander, Mira Road, Borivali, Goregaon, Andheri, Bandra, Dadar, Lower Parel, Mumbai Central on the western line; 
  • Shahad, Kalyan, Dombivli, Thane, Mulund, Ghatkopar, Kurla, Dadar on the Central Main line
  • Chembur and Wadala on Harbour line.

Read More: http://www.mid-day.com/articles/a-railway-budget-to-bring-mumbai-back-on-track/16021192

http://www.freepressjournal.in/prabhu-makes-mumbai-smile/ 

Mira Road station will see escalator soon

Reports:

Final Report – Mumbai Railway Vikas Corporation Ltd.

Executive Summary – Mumbai Railway Vikas Corporation Ltd.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.